Master Facilities Plan
Capital improvements now underway

Douglas Campus
Sierra Vista Campus
Willcox Center
Benson Center

The Cochise College Governing Board in December 2007 approved a number of capital improvement projects, which the college will initiate in 2008. The initial projects - on both the Douglas and Sierra Vista campuses - are part of the Master Facilities Plan, which was originally developed to modernize substandard facilities, upgrade classroom technology and learning environments, and create space to accommodate growth. Since Cochise County voters rejected a bond proposal to fund the plan, the college has modified it to address inadequate and substandard facilities that have the greatest impact on student learning and life and infrastructure systems that are inefficient or ineffective. The revised plan does not address significant growth and calls on funding sources without imposing a secondary property tax levy.

When visiting the Douglas and Sierra Vista Campuses, use caution and be aware of construction sites, vehicles, and personnel. Click here to see the latest impact of campus construction.

Douglas Campus
Campus concept as of Dec. 18, 2007
Click for larger view (JPG, 433KB)

dcmap

Project

Details

Status

Soccer Field 

Field to be widened to regulation size for playoffs/tournaments 

Work began in January 2008, with field ready for August season. 

Little Theatre 

Renovations to include new house and stage lighting systems, new seats with swing-up tablet arms, amplified sound system, mediated classroom equipment, improved accessibility, remodeled dressing and restrooms, and a general facelift to include carpet, paint and finishing.  

Work anticipated to begin in March or April 2008, with work completed in time for fall 2008 semester. 

Residence Halls

Plans call for three new "communities" on both sides of the campus loop road. Pod-style living space will accommodate about 144 residents.

In design, not yet reviewed by Governing Board.

Student Services Renovations 

Planned renovations will focus on improving the 600 and 1000 Buildings into a more functional and student-friendly learning center.

Tentatively set for summer 2008. 

Science Building 

New 8,500-square-foot facility to be located just north of the current science building, which will be renovated for classrooms and offices. 

In design, not yet reviewed by Governing Board. 

Career-Technical Education Building 

New 10,500-square-foot facility to be located outside the loop road on the northeast side of campus. 

In design, not yet reviewed by Governing Board.

Renovations 

Planners are reviewing the scope of renovations to buildings throughout campus.

TBA

Architect: The Breckenridge Group
Construction Manager at Risk: Lloyd Construction, Tucson, previously worked on the Sierra Vista Campus library and science buildings.

In order to share ideas and create similarities between campuses, Lloyd and Breckenridge meet periodically with the firms working on the Sierra Vista Campus.

TOP

Sierra Vista Campus
Campus concept as of Dec. 18, 2007
Click for larger view (JPG, 955 KB)

svmap

 

Project

Details

Status

Science Building Addition 

Project will add approximately 7,500 square feet of labs, classrooms, preparation and storage space to the existing structure.

Work began in January 2008, with completion before the start of the fall semester. 

Career-Technical Education Building 

A new 15,000-square-foot building on the east side of campus will be flexibly designed to accomodate welding, building/construction technology and other technical programs.

Work began in January 2008, with completion before the start of the fall semester. 

Site Improvements

Work in the vicinity of the projects above includes a new domestic water line, fire hydrant relocation, electrical services, and fire alarm, data and communications, as well as a new sewer line.

Work began in January 2008, with completion before the start of the fall semester.

Academic Building

New learning center to house computer labs, tutoring services, group study rooms, and offices.

In design, not yet reviewed by Governing Board. 

Student Union

New facility to house admission and registration, bookstore, food service, and sizable community meeting room, with some space to be shared with the University of Arizona South. 

In design, not yet reviewed by Governing Board. 

Renovations 

Planners are reviewing the scope of renovations to buildings throughout campus.

TBA


Architect: DLR Group
Construction Manager at Risk: Sundt Construction

TOP

Willcox Center
ABA Architects of Tucson has been selected to design an approximately 8,000-square-foot facility on Willcox Unified School District property. The architects were selected by a committee made up of representatives from the college, the school district, and the community. A design will be shared with both the Cochise College Governing Board and the WUSD board late in 2008. The current Cochise College Willcox Center is located on land the college leases from the district.

TOP

Benson Center
The college is including in its long-term financial planning expansion of the Benson Center contingent upon growth.

TOP

 


 Last Updated On: 3/25/08